1. Welcome Guest! In order to create a new topic or reply to an existing one, you must register first. It is easy and free. Click here to sign up now!.
    Dismiss Notice

The routeing of the wires under the MOBO - held in place with electrical tape to stop them snagging on the solder under the MOBO - try and place cables under the MOBO where applicable to increase airflow.

Click on the photo to start tagging. Done Tagging

In This Album

Installing the optical drive (DVD-RW) Lining up the optical drive with the front panel before tightening. Fixing the Optical drive in place, one screw top left and one bottom right (either side) - you can install all 4 screws (either side) but only 2 are needed really. 500GB SATA II HDD Finished 2 user2077 pic67 1221170132 Antec 300 Gamer Case Antec 300 Gamer Case (side off) AW9D-MAX MOBO The routeing of the wires under the MOBO - held in place with electrical tape to stop them snagging on the solder under the MOBO - try and place cables under the MOBO where applicable to increase airflow. PSU installed and MOBO. AW9D-MAX MOBO (all passively cooled) this is the Northbridge. CPU installed and MAIN 24 pin cable installed. OCZ 6400 Crossfire Certified RAM Installing the RAM. Routeing the power cables between the RAM to maximise airflow.

Share This Page